provenmetal.com is built with Next.js, hosted on AWS behind Cloudflare. It measures traffic with Vercel Web Analytics. It sends email through Amazon SES.
| Technology | Version | First seen |
|---|---|---|
| JavaScript Frameworks & Libraries2 | ||
| 16.2.9 | 6 Nov 2026 | |
| – | 6 Nov 2026 | |
| Frontend Build Tools & CSS2 | ||
| – | 6 Nov 2026 | |
| Web Servers, Languages & Backend Frameworks1 | ||
| CDN & Hosting3 | ||
| – | 6 Nov 2026 | |
| Analytics & Tag Management1 | ||
| – | 6 Nov 2026 | |
| Advertising & Affiliate Tracking1 | ||
| – | 6 Nov 2026 | |
| Transactional Email2 | ||
| – | 6 Nov 2026 | |
| Accessibility1 | ||
| – | 6 Nov 2026 | |
| Fonts & Icon Fonts1 | ||
| – | 6 Nov 2026 | |
| Security, WAF & Bot Protection1 | ||
| – | 6 Nov 2026 | |
Registration from the registry's RDAP record, the certificate the site serves, and its rank in public traffic lists.
The crew hasn’t read this site’s colors yet. We read a palette when we capture a site’s screenshot, busiest sites first. Meanwhile, browse palettes from other sites.
Counted from every stack change we've recorded: of the sites we watched running one of this site's tools, how many went on to add another. A pattern across sites, not a forecast for this one.
smtp.google.comns2.vercel-dns.comns1.vercel-dns.comamazon.comletsencrypt.orgpki.googsectigo.comgoogle-site-verification=5CWeyFUWWixMGf9FzhkhC8VJMPbr2SLozBWVbtBMERAv=spf1 include:_spf.google.com ~allv=DMARC1; p=none; rua=mailto:dmarc@provenmetal.comUser-Agent: * Allow: / Host: https://provenmetal.com Sitemap: https://provenmetal.com/sitemap.xml
# ProvenMetal > ProvenMetal builds printed circuit boards fast. We cut PCB lead times in half with automated quoting, DFM review and part sourcing, route each order to the right fab and assembly house in our domestic and overseas manufacturing network, and track every build through delivery. Standard builds take 5–7 days, quote to ship. When a program requires it, the whole build stays inside a US supply base, and ITAR-controlled designs are built only by US partners. ## Order - [Get a quote](https://central.provenmetal.com/order?step=upload): Upload design files and choose fabrication, assembly and part sourcing; the quote states price and ship date before approval. - [Order with an agent](https://provenmetal.com/mcp): Connect an MCP-capable agent to get a live JLCPCB quote from a KiCad project or Gerber zip, then pay through ProvenMetal checkout. - [MCP setup and tools](https://provenmetal.com/agents/setup): The hosted MCP at https://mcp.provenmetal.com gives an instant JLCPCB price and checkout link with no sign-in. Includes setup commands and tool names. ## Main pages - [Capabilities](https://provenmetal.com/capabilities): Capabilities for 5–7-day PCB builds: up to 32 layers, HDI, rigid-flex, RF, sourcing, US assembly, inspection, and test. Fully domestic when required. - [Resources](https://provenmetal.com/resources): KiCad and Altium plugins, instant JLCPCB ordering over ProvenMetal MCP, API access, and build specs. - [KiCad plugin](https://provenmetal.com/plugins/kicad): Source a KiCad BOM against live stock and lead times, and flag long-lead and unsourceable parts before they hold up a build. - [Security](https://provenmetal.com/security): How ProvenMetal protects PCB designs, BOMs, and order data, including manual DFM review and a fully domestic build option. - [Suppliers](https://provenmetal.com/suppliers): Apply as a PCB fabrication, assembly, sourcing, testing, or integration partner. - [Blog](https://provenmetal.com/blog): Essays on reshoring PCB manufacturing, shortening hardware lead times, and building more electronics in America. ## Optional - [Careers](https://provenmetal.com/careers) - [Privacy](https://provenmetal.com/privacy) - [Terms](https://provenmetal.com/terms)
| – |
| 6 Nov 2026 |
| – |
| 6 Nov 2026 |
| – |
| 6 Nov 2026 |
| – | 6 Nov 2026 |
| – |
| 6 Nov 2026 |